- Sep 23 '13 fra>eng chaussée réservoir retention reservoir roadway pro closed ok
- Oct 12 '11 fra>eng coffret de chantier temporary fuse box during building work pro closed ok
- Aug 8 '10 fra>eng molette cutting disc pro closed no
- Aug 8 '10 fra>eng grattoir à joints pointing trowel pro closed no
- Apr 24 '10 fra>eng gabarit engagé for (in this context) pro closed no
- Mar 17 '10 fra>eng Visite de récolement compliance visit pro closed ok
- Mar 2 '10 fra>eng étude d’exécution building works specification pro closed ok
- Mar 1 '10 fra>eng robinet avec raccord au nez a tap with a connection at the opening pro closed no
- Feb 24 '10 fra>eng rationalité constructive internal integrity pro closed ok
- Feb 8 '10 fra>eng paumelles turlupees decorated hinges pro closed ok
- Jan 27 '10 fra>eng poinçon fin type alène Bradawl pro just_closed no
3 Dec 11 '09 fra>eng dispositifs de retenue road barriers/crash barriers pro closed ok
- Jul 4 '09 fra>eng un portique à deux traverses a doubled beam pro closed ok
- Oct 20 '08 fra>eng diffus specialised (and made to measure) pro closed ok
4 Oct 3 '08 fra>eng Rapport de marche g + 2 h = 630 mm Blondel Theory pro closed ok
4 Oct 2 '08 fra>eng multi denté à dégagement important à dent dure hard toothed, many toothed with wide kerf pro closed no
- Aug 14 '08 fra>eng tissu ouvert Built in an open way pro closed no
- Aug 3 '08 fra>eng programmes de logements plan accommodation programmes, plans,... pro closed ok
- Aug 2 '08 fra>eng découpages en volumes (offering) individual appartments pro closed no
- Jul 26 '08 fra>eng protocol de séance report of the meeting pro closed ok
- Jul 10 '08 eng>eng please help fill the missing part in this sentence change "to the anchor" to "anchored" pro closed no
- Jun 29 '08 fra>eng lance incendie à poste Fixed Fire hose pro just_closed no
- Jun 29 '08 fra>eng rebouchage coupe-feu Fire Stop or Seal pro just_closed no
- Jun 13 '08 fra>eng mortier de calage levelling mortar pro closed ok
- Jun 8 '08 fra>eng Chanlatte de départ First Roof Batten pro closed ok
- Jun 7 '08 fra>eng bois sec hors coeur dry wood, not boxed heart pro closed no
- May 30 '08 fra>eng joint marqué accentuated joints pro closed ok
- May 17 '08 fra>eng Gangue Coat pro closed no
- May 6 '08 fra>eng épis de fond Footing pro closed ok
- Apr 28 '08 fra>eng signe une architecture affirmée demonstrates confident design pro closed ok
- Apr 15 '08 fra>eng écran sous toiture roofing felt pro closed no
- Apr 15 '08 fra>eng Vide sanitaire Basement pro closed ok
- Apr 14 '08 fra>eng au rabais lowest priced tender basis pro closed no
- Apr 14 '08 fra>eng mettre en charge put into effect pro just_closed no
- Apr 12 '08 fra>eng pièce sèche rooms that have dried out pro closed ok
- Apr 5 '08 fra>eng en sous-oeuvre (HERE) foundations pro closed ok
- Mar 31 '08 fra>eng douille à l'anglaise Sleeve pro closed ok
- Mar 17 '08 fra>eng arrêt d'unité closing down units pro closed ok
- Mar 2 '08 fra>eng couteau américain plastering knife pro closed ok
4 Feb 26 '08 fra>eng au retrait de l'alignement set back from the building line pro closed ok
- Feb 23 '08 fra>eng Dévouteur doseur calibrated hopper pro closed ok
- Feb 20 '08 fra>eng nef Hangar pro closed ok