French term

coffret de chantier

French to English Tech/Engineering Construction / Civil Engineering health and safety
En cas d’utilisation d’appareils électriques portatifs, l’entreprise de sous-traitance disposera d’un coffret ou d’une station de chantier, munie d’un disjoncteur différentiel 30 mA, pour la protection des personnes et des matériels
Change log

Feb 10, 2012 23:17: Tony M Created KOG entry

Discussion

Bourth (X) Oct 12, 2011:
Just out of interest Is this a "shall have such a unit" or a "such a unit will be provided" (by the Employer)? I suspect the former, which might change the nature of the beast. I imagine in the UK this is simply a "transformer" since site power tools are 110 volts.

Proposed translations

+1
16 mins
Selected

(building) site connecting box

These are the sort of things you see stuck on a post around building sites, there are now quite strict regulations as to just what they must include.

--------------------------------------------------
Note added at 1 heure (2011-10-12 16:18:28 GMT)
--------------------------------------------------

Note that current building sitre regulations limit the length of extension leads, as pointed out by Bourth below, and hence most specifications state that a sufficient number of these 'coffrets' must be installed so that not working position is more than X metres from one; on one very extensive building site I translated the H&S requirements for (a large power station), this meant that there were dozens of these darned things to be installed, no doubt at great expense!
Peer comment(s):

agree Bourth (X) : Though might it not be a mobile unit, like a transformer? If there's only one of these things and the site is large, there'd be some long extension cords about!
14 mins
Thanks, Alex! No, I believe the 'coffret' is the base unit from which the other things are connected, and into which the trafos are plugged.
Something went wrong...
4 KudoZ points awarded for this answer.
13 mins

worksite control panel

I think this is what they mean
Something went wrong...
18 mins

site connection cabinet

electrical supply point.
Something went wrong...
57 mins

[Building] site power distribution unit

often seen as PDU
Something went wrong...
2 hrs

temporary fuse box during building work

Ours is still here after 6 years

It does carry out the function of debranching wjhen there is an overload
therefore it must be a fuse box?

--------------------------------------------------
Note added at 2 hrs (2011-10-12 16:58:42 GMT)
--------------------------------------------------

Yes ours is 30 mega amps as well