English to Serbian: Project Specification and Reporting General field: Tech/Engineering Detailed field: Electronics / Elect Eng
Source text - English Project Specification and Reporting
A.1 Technical Description (Article 6.02)
Purpose, Location
The project has the purpose of maintaining and improving the reliability and quality of power supply, reducing technical losses, and lowering operation and maintenance costs. The schemes are geographically dispersed all over Serbia.
Description
The project consists of supply of equipment for six power substation schemes, either in the form of rehabilitation, extension or new construction:
• Supply of the eqipment for reconstruction of 220/110 kV Krusevac substation with 2x250MVA new cappacity
• Supply of the eqipment for construction of new 400/110 kV Vranje 4 substation with 300MVA new cappacity, 1km 400kV and 18km 110kV overhead line
• Supply of the eqipment for construction of new 220/110 kV Bistrica substation, with 250MVA new cappacity, 21,5km 220kV and 11,5km 110kV overhead line
• Supply of the eqipment (220kV) for reconstruction of 220/110 kV Beograd 3 substation
• Supply of the eqipment for reconstruction of 220/110 kV Srbobran substation
• Supply of the eqipment for extension to 400kV of 220/110 kV Smederevo 3 substation, with 300MVA new cappacity and 2x6km 400kV overhead line
Translation - Serbian Project Specification and Reporting
A.1 Technical Description (Article 6.02)
Purpose, Location
The project has the purpose of maintaining and improving the reliability and quality of power supply, reducing technical losses, and lowering operation and maintenance costs. The schemes are geographically dispersed all over Serbia.
Description
The project consists of supply of equipment for six power substation schemes, either in the form of rehabilitation, extension or new construction:
• Supply of the eqipment for reconstruction of 220/110 kV Krusevac substation with 2x250MVA new cappacity
• Supply of the eqipment for construction of new 400/110 kV Vranje 4 substation with 300MVA new cappacity, 1km 400kV and 18km 110kV overhead line
• Supply of the eqipment for construction of new 220/110 kV Bistrica substation, with 250MVA new cappacity, 21,5km 220kV and 11,5km 110kV overhead line
• Supply of the eqipment (220kV) for reconstruction of 220/110 kV Beograd 3 substation
• Supply of the eqipment for reconstruction of 220/110 kV Srbobran substation
• Supply of the eqipment for extension to 400kV of 220/110 kV Smederevo 3 substation, with 300MVA new cappacity and 2x6km 400kV overhead line