Apr 4, 2020 01:32
4 yrs ago
17 viewers *
English term
train tracking
English to Spanish
Tech/Engineering
Transport / Transportation / Shipping
The first functional test to be performed is train tracking; it can also be done with a train in the bypass mode not being controlled by the CBTC system. Tracking by the ZC and the ATS is tested at the same time and can be considered a low-level CBTC test. If the communication is ready and the equipment has been subject to PICO, the train tracking tests may be performed at the same time as the localization tests. Following the train tracking tests, the CBTC basic functions are verified.
ZC = Zone Controller (artefacto que transmite una señal de movimiento a cada tren)
ATS = Supervisión automática de trenes
ZC = Zone Controller (artefacto que transmite una señal de movimiento a cada tren)
ATS = Supervisión automática de trenes
Proposed translations
(Spanish)
4 +1 | rastreo de tren(es) | David Hollywood |
Proposed translations
+1
49 mins
Selected
rastreo de tren(es)
El rastreo del tren no se encuentra activo ya que el sistema estuvo sin usarse más de 10 minutos. Actualice su buscador para comenzar a rastrear trenes.
4 KudoZ points awarded for this answer.
Something went wrong...