Glossary entry (derived from question below)
English term or phrase:
PMRF
Arabic translation:
مصفاة تشغيل أو معالجة متعددة الدفق
Added to glossary by
Hasna Chakir
Jun 8, 2013 19:32
11 yrs ago
1 viewer *
English term
PMRF
English to Arabic
Tech/Engineering
Petroleum Eng/Sci
Inadequate Preventive Maintenance Programme (The passing valves was not reported to maintenance; Closed drain system had leaked 12 times since 2006.
PMRF raised to replace the closed drain header)
PMRF raised to replace the closed drain header)
Proposed translations
(Arabic)
5 +2 | مصفاة تشغيل أو معالجة متعددة الدفق | Hasna Chakir |
4 +1 | برنامج صيانة وقائية غير مناسب للموقف/ خطأ في تنفيذ /خطوات برنامج الصيانة الوقائية | Mohamed Magdy |
Change log
Jun 13, 2013 07:54: Hasna Chakir Created KOG entry
Proposed translations
+2
1 hr
Selected
مصفاة تشغيل أو معالجة متعددة الدفق
Process Multi-Rheo Filter
4 KudoZ points awarded for this answer.
Comment: "Thank you all :)"
+1
1 hr
برنامج صيانة وقائية غير مناسب للموقف/ خطأ في تنفيذ /خطوات برنامج الصيانة الوقائية
-
Discussion
Pacific Missile Range Facility
Precision Manufacturing Research Facility (University of Alabama)
Precision Manufacturing Research Facility (University of Alabama)
Pacific Missile Range Facility. Or it could be a name of a company?
Inadequate Leadership (Deviation from SOP was known but no effective corrective action was taken; Instead of replacing/fixing passing valves, these were kept in closed position; No effective ) Inadequate Preventive Maintenance Programme (Programme (The passing valves was not reported to maintenance; Closed drain system had leaked 12 times since 2006. PMRF raised to replace the closed drain header)
Incident :
Since 2006, due to corrosion, the closed drain network had leaked 12 times. The drain header is isolated from drain network by closing two manual isolation valves and accordingly the purging fuel gas isolated. Due to passing problems in the Train instruments and process drain valves, these main two manual isolation valves were kept in closed position and these were opened if there was demand to drain. 1st stage level transmitter of train 2 was flushed and transmitter chamber was drained to process drain without lining it up to underground drain header. The process drain line, already subjected to corrosion, was exposed to 18 bar pressure and a leak developed causing activation of H2S alarm. Outcome: The train production was shifted to other trains and started depressurizing the train to flare.