Glossary entry (derived from question below)
English term or phrase:
Integrated risk informed decision making
Croatian translation:
integrirano odlučivanje na temelju poznavanja rizika
Added to glossary by
Vesna Maširević
May 9, 2012 06:45
12 yrs ago
2 viewers *
English term
Integrated risk informed decision making
English to Croatian
Tech/Engineering
Other
Nazalost nemam konteksta, to je samo jedna od stavki, a radi se o jednoj radionici na kojoj će se raspravljati o toj temi.
Hvala,
Laura
Hvala,
Laura
Proposed translations
(Croatian)
4 +6 | integrirano odlučivanje na temelju poznavanja rizika |
Vesna Maširević
![]() |
3 | Integrirani pristup donošenju informirane odluke u vezi s rizikom |
Darko Kolega
![]() |
Change log
Dec 14, 2015 07:41: Vesna Maširević Created KOG entry
Proposed translations
+6
37 mins
Selected
integrirano odlučivanje na temelju poznavanja rizika
http://www.dzns.hr/_download/repository/izvjesce2005DZNS.pdf
Republika Hrvatska ~ Državni zavod za nuklearnu sigurnost
odlučivanje na temelju poznavanja rizika ~ Risk Informed Decision Making
http://www-pub.iaea.org/MTCD/publications/PDF/Pub1499_web.pd...
International Nuclear Safety Group
integrated risk informed decision making (IRIDM) is a systematic process aimed at the integration of the major considerations influencing nuclear power plant safety. The main goal of IRIDM is to ensure that any decision affecting nuclear safety is optimized without unduly limiting the conduct of operation of the nuclear power plant. It underpins nuclear safety decisions and ensures consistency with the safety goals of the Member State.
http://www.ursjv.gov.si/fileadmin/ujv.gov.si/pageuploads/Inf...
...an integrated decision making process which combines the risk insights from probabilistic analysis with the deterministic approach and also takes into account other requirements (legal, regulatory, cost–benefit, good engineering practices, etc.) is an effective means of refining and improving the design, operation, and regulation of nuclear installations. Such an integrated approach is commonly referred to as integrated risk informed decision making (IRIDM).
Republika Hrvatska ~ Državni zavod za nuklearnu sigurnost
odlučivanje na temelju poznavanja rizika ~ Risk Informed Decision Making
http://www-pub.iaea.org/MTCD/publications/PDF/Pub1499_web.pd...
International Nuclear Safety Group
integrated risk informed decision making (IRIDM) is a systematic process aimed at the integration of the major considerations influencing nuclear power plant safety. The main goal of IRIDM is to ensure that any decision affecting nuclear safety is optimized without unduly limiting the conduct of operation of the nuclear power plant. It underpins nuclear safety decisions and ensures consistency with the safety goals of the Member State.
http://www.ursjv.gov.si/fileadmin/ujv.gov.si/pageuploads/Inf...
...an integrated decision making process which combines the risk insights from probabilistic analysis with the deterministic approach and also takes into account other requirements (legal, regulatory, cost–benefit, good engineering practices, etc.) is an effective means of refining and improving the design, operation, and regulation of nuclear installations. Such an integrated approach is commonly referred to as integrated risk informed decision making (IRIDM).
4 KudoZ points awarded for this answer.
Comment: "Hvala.
Laura"
8 mins
Integrirani pristup donošenju informirane odluke u vezi s rizikom
odokativno