Glossary entry (derived from question below)
Polish term or phrase:
klucz powłoki
English translation:
crown of a soil-steel bridge structure/steel plate culvert
Added to glossary by
Frank Szmulowicz, Ph. D.
Feb 26, 2016 11:22
8 yrs ago
Polish term
klucz powłoki
Polish to English
Tech/Engineering
Construction / Civil Engineering
bridge construction
ugięcie klucza powłoki obiektu
Proposed translations
(English)
3 | crown of a soil-steel bridge structure/steel plate culvert | Frank Szmulowicz, Ph. D. |
3 | at the apex of the structure | IRA100 |
Change log
Mar 2, 2016 11:16: Frank Szmulowicz, Ph. D. Created KOG entry
Proposed translations
23 mins
Selected
crown of a soil-steel bridge structure/steel plate culvert
One possible interpretation.
[4] MACHELSKI C. JANUSZ L.: Estimation of bending moments in the crown
of a soil-steel bridge structure during backfilling. 6
th European Conference on Steel and Composite Structures. Eurosteel 2011. Budapest, 31-2 September,
2011 p. 1365-1370.
http://www.konstrukcje-zespolone.uz.zgora.pl/INNE/Konstrukcj...
--------------------------------------------------
Note added at 4 hrs (2016-02-26 15:51:07 GMT)
--------------------------------------------------
Obliczone wartości momentów zginających od obciążeń stałych i ruchomych dotyczą korony (klucz) powłoki
http://mosty.inzynieria.com/cat/8/art/19902/mostowe-konstruk...
[4] MACHELSKI C. JANUSZ L.: Estimation of bending moments in the crown
of a soil-steel bridge structure during backfilling. 6
th European Conference on Steel and Composite Structures. Eurosteel 2011. Budapest, 31-2 September,
2011 p. 1365-1370.
http://www.konstrukcje-zespolone.uz.zgora.pl/INNE/Konstrukcj...
--------------------------------------------------
Note added at 4 hrs (2016-02-26 15:51:07 GMT)
--------------------------------------------------
Obliczone wartości momentów zginających od obciążeń stałych i ruchomych dotyczą korony (klucz) powłoki
http://mosty.inzynieria.com/cat/8/art/19902/mostowe-konstruk...
Note from asker:
Wielkie dzięki! |
4 KudoZ points awarded for this answer.
4 hrs
at the apex of the structure
klucz jest punktem najwyższym
--------------------------------------------------
Note added at 6 godz. (2016-02-26 18:10:33 GMT)
--------------------------------------------------
deflection at the apex of the structure
--------------------------------------------------
Note added at 1 dzień 42 min (2016-02-27 12:04:51 GMT)
--------------------------------------------------
deflection at the apex of the flexible structure
apex of the arch
--------------------------------------------------
Note added at 6 godz. (2016-02-26 18:10:33 GMT)
--------------------------------------------------
deflection at the apex of the structure
--------------------------------------------------
Note added at 1 dzień 42 min (2016-02-27 12:04:51 GMT)
--------------------------------------------------
deflection at the apex of the flexible structure
apex of the arch
Discussion
Gdy położenia punktów AB w zdeformowanej powłoce znajdują się na
wielu poziomach, jak na rys. 3 otrzymuje się ze wzoru (3) funkcję R(F). Na rys.
6 przedstawiono wykresy takich funkcji obliczone na podstawie pomiarów geodezyjnych.
Analizę zmian deformacji powłoki rozpoczęto od stanu początkowego
(O), gdy pod ciężarem własnym klucz powłoki ulega spłaszczeniu a promień..
http://www.konstrukcje-zespolone.uz.zgora.pl/INNE/Konstrukcj...
krzywizny jest największy. Podczas układania zasypki górna część powłoki
ulega wypiętrzeniu a boczna zwężeniu odpowiednio do postępu prac, jak na rys.
4.
http://mosty.inzynieria.com/cat/8/art/19902/mostowe-konstruk...
http://mosty.inzynieria.com/cat/8/art/19902/mostowe-konstruk...