Work procedures on building contracts. Column in a "Contaract analysis checklist" headed "Potentielles KO-Kriterium"
- potential knockout criterion??
- potential knockout criterion??
Proposed translations
(English)
4 | knockout criteria | Beth Kantus |
4 +2 | potential rejection/exit criterion | Steffen Walter |
4 | Potential project stoppers | Craig Hills |
2 | exclusion criterion | Cilian O'Tuama |
Proposed translations
1 hr
Selected
knockout criteria
I have also seen make-or-break criteria used, but generally in a different context.
HTH!
(Of course if there is really only a single factor named that will eliminate the contract or bid from consideration, then singular: criterion.)
Lecture 14. IT Procurement
... Remaining systems are scored against criteria. Knockout criteria
should be considered which eliminate bids if they are not met. ...
www.cms.dmu.ac.uk/~nkm/ism/LECT14.html - 10k
System Selection
System Selection. Business requirements. Knockout criteria. Long List/ Short
list. Invitation to Tender. Evaluation and weighting. Reference sites and demos. ...
www.isaca.lv/pasakumi/Referati99/DLewis/tsld013.htm - 2k
CUL StaffWeb/LMS Steering Committee
... 3. Next, we discussed "make-or-break" criteria for selecting the new
system. The Evaluation Committee had come up with six criteria. ...
www.library.cornell.edu/staffweb/ LMSsteer/LMSSteer970528.html - 6k
HTH!
(Of course if there is really only a single factor named that will eliminate the contract or bid from consideration, then singular: criterion.)
Lecture 14. IT Procurement
... Remaining systems are scored against criteria. Knockout criteria
should be considered which eliminate bids if they are not met. ...
www.cms.dmu.ac.uk/~nkm/ism/LECT14.html - 10k
System Selection
System Selection. Business requirements. Knockout criteria. Long List/ Short
list. Invitation to Tender. Evaluation and weighting. Reference sites and demos. ...
www.isaca.lv/pasakumi/Referati99/DLewis/tsld013.htm - 2k
CUL StaffWeb/LMS Steering Committee
... 3. Next, we discussed "make-or-break" criteria for selecting the new
system. The Evaluation Committee had come up with six criteria. ...
www.library.cornell.edu/staffweb/ LMSsteer/LMSSteer970528.html - 6k
4 KudoZ points awarded for this answer.
+2
8 mins
potential rejection/exit criterion
in the sense that
a) this criterion is applied prior to contract award (i.e. during the procedure of selecting the best bidder)
= bidder rejection criterion
or
b) criterion is applied to contract awarded (concluded)
= exit/withdrawal criterion
--------------------------------------------------
Note added at 2002-08-02 10:48:45 (GMT)
--------------------------------------------------
possible reformulation in case b):
criterion to exit/withdraw from contract
--------------------------------------------------
Note added at 2002-08-02 10:51:19 (GMT)
--------------------------------------------------
However, case a) seems more likely IMO since the original sounds like being an analysis of draft contracts which should ultimately lead to selection of the best contract from the customer\'s point of view.
a) this criterion is applied prior to contract award (i.e. during the procedure of selecting the best bidder)
= bidder rejection criterion
or
b) criterion is applied to contract awarded (concluded)
= exit/withdrawal criterion
--------------------------------------------------
Note added at 2002-08-02 10:48:45 (GMT)
--------------------------------------------------
possible reformulation in case b):
criterion to exit/withdraw from contract
--------------------------------------------------
Note added at 2002-08-02 10:51:19 (GMT)
--------------------------------------------------
However, case a) seems more likely IMO since the original sounds like being an analysis of draft contracts which should ultimately lead to selection of the best contract from the customer\'s point of view.
Peer comment(s):
agree |
Rebecca Holmes
3 mins
|
Vielen Dank, Rebecca ;-)
|
|
agree |
Friedrich Reinold
: This is certainly a) and refers to a criterion that must be met otherwise the entire proposal is rejected.
10 mins
|
Thanks for confirming my likelihood assumption ;-)
|
2 hrs
exclusion criterion
perhaps (Ausschlußkriterium)
2 days 13 hrs
Potential project stoppers
Typically though in the Automotive industry we use it to mean the criteria needed for us to stop the project from continuing, (usually due to unwanted product concerns or cost issues.)
We do also say KO criteria, could also say potential project stopping criteria. How about "Project cessation criteria"?
We do also say KO criteria, could also say potential project stopping criteria. How about "Project cessation criteria"?