Glossary entry (derived from question below)
French term or phrase:
freinte et repasses
English translation:
shrinkage and rerun
Added to glossary by
DocteurPC
Jan 30, 2005 19:23
19 yrs ago
1 viewer *
French term
freinte et repasses
French to English
Tech/Engineering
Manufacturing
industrial food processing
this is in the context of industrial food processing. The terms refer to loss and shrinkage during the production process. I am trying to find the right terms in English.
Any help would be greatly appreciated.
Thanks.
Any help would be greatly appreciated.
Thanks.
Proposed translations
(English)
4 | shrinkage and rerun | DocteurPC |
4 +1 | shrinkage and... depending on your context | Martine Brault |
4 | waste and rework | swisstell |
Proposed translations
4 hrs
Selected
shrinkage and rerun
a lot of food is passed more than once through machines (or hands - but not many of those anymore)
it shrinks (see other answer) and is rerun a second, third time
think of olive oil - première pression, deuxième pression,....
--------------------------------------------------
Note added at 4 hrs 56 mins (2005-01-31 00:19:48 GMT)
--------------------------------------------------
wordreference gives press for repasse - depending on the process in your question, it might be a better term
it shrinks (see other answer) and is rerun a second, third time
think of olive oil - première pression, deuxième pression,....
--------------------------------------------------
Note added at 4 hrs 56 mins (2005-01-31 00:19:48 GMT)
--------------------------------------------------
wordreference gives press for repasse - depending on the process in your question, it might be a better term
4 KudoZ points awarded for this answer.
Comment: "rerun was fine for the context - thanks."
22 mins
waste and rework
from my past experience
--------------------------------------------------
Note added at 24 mins (2005-01-30 19:47:32 GMT)
--------------------------------------------------
Six Sigma Simplified Training System - [ Diese Seite übersetzen ]
... Time after time, I have found that as little as 4% of your business produces
over half of the waste and rework. Through laser-focused ...
www.sixsigmatoolbelt.com/six-sigma-training.html - 27k - Im Cache - Ähnliche Seiten
[ Weitere Ergebnisse von www.sixsigmatoolbelt.com ]
Lincoln Technology Corporation - Maintenance Management, Inventory ... - [ Diese Seite übersetzen ]
... Assigning a un-justified “EMERGENCY WO status” creates huge waste and rework costs
for maintenance and delays implementation of high value planned work. ...
www.lincolntechnology.com/mp/mpchallenges.htm - 15k - Im Cache - Ähnliche Seiten
Hertzler Systems Inc. - [ Diese Seite übersetzen ]
... To reduce scrap, waste and rework, save time, and save money, the analyst must be
able to get the most from the GainSeeker charts and reports module. ...
www.hertzler.com/html/sup_train_web_classes.asp
--------------------------------------------------
Note added at 24 mins (2005-01-30 19:47:32 GMT)
--------------------------------------------------
Six Sigma Simplified Training System - [ Diese Seite übersetzen ]
... Time after time, I have found that as little as 4% of your business produces
over half of the waste and rework. Through laser-focused ...
www.sixsigmatoolbelt.com/six-sigma-training.html - 27k - Im Cache - Ähnliche Seiten
[ Weitere Ergebnisse von www.sixsigmatoolbelt.com ]
Lincoln Technology Corporation - Maintenance Management, Inventory ... - [ Diese Seite übersetzen ]
... Assigning a un-justified “EMERGENCY WO status” creates huge waste and rework costs
for maintenance and delays implementation of high value planned work. ...
www.lincolntechnology.com/mp/mpchallenges.htm - 15k - Im Cache - Ähnliche Seiten
Hertzler Systems Inc. - [ Diese Seite übersetzen ]
... To reduce scrap, waste and rework, save time, and save money, the analyst must be
able to get the most from the GainSeeker charts and reports module. ...
www.hertzler.com/html/sup_train_web_classes.asp
+1
2 hrs
shrinkage and... depending on your context
Freintes is shrinkage. It refers to losses incurred either during the production process or during stockage. Shrinkage is a "normal loss" due to time, temperature, etc. Wastage ia broader and may also refer to unusual losses, or losses due to mishandling.
Repasses may be have different meanings depending on the context. In the wheat industry it would be middlings
" Useful Feed for Cattle; wheat mids, or middlings, refer to
the co-product remaining after flour or semolina is extracted from wheat and "
In beer or milk production (or any liquid), it is the last running or stripping of the liquid - much weaker than the first runs.
"The first running or last running beer reaches the first running
or last running tank and the water reaches the channel"
http://www.analyticalprocess.com/beer.pdf
Good luck!
Repasses may be have different meanings depending on the context. In the wheat industry it would be middlings
" Useful Feed for Cattle; wheat mids, or middlings, refer to
the co-product remaining after flour or semolina is extracted from wheat and "
In beer or milk production (or any liquid), it is the last running or stripping of the liquid - much weaker than the first runs.
"The first running or last running beer reaches the first running
or last running tank and the water reaches the channel"
http://www.analyticalprocess.com/beer.pdf
Good luck!
Something went wrong...