This question was closed without grading. Reason: Other
Jun 23, 2013 02:42
11 yrs ago
English term

run-check switch

English to Spanish Tech/Engineering Mechanics / Mech Engineering ADJUSTMENTS OIL FIRING
The separate compressor system is shipped without oil to avoid spills. At start-up, fill the tank to the middle of gauge glass. Start system. Oil level will drop as cooling coil is filled. Re-adjust level to middle of gauge glass.

Use Non-Detergent type oil SAE-30. For low ambient temperatures, (less than 32 degrees F. use SAE-10 oil.

Check vacuum gauge at circulating pump inlet. 15” HG Maximum.

Check pilot. Place flame safeguard control run-check switch to check position to hold pilot on indefinitely. Perform turn down test to determine minimum pressure requirement. Adjust back to normal (3 to 6” W.C.)
Replace switch to run position.

Discussion

lorenab23 Jun 23, 2013:
to hold pilot on indefinitely para mantener el piloto prendido indefinidamente. Once you perform the test then you return the switch to the "run" position...
lorenab23 Jun 23, 2013:
place to check position. You have a switch for the flame safeguard control that has 2 functions (1)run and (2)check.
JoLuGo Jun 23, 2013:
...coloque el conmutador de comprobación de marcha a la posición "comprobación" ...
/Run
conmutador comprobación-marcha a la posición <
\ Check
Lydianette Soza (asker) Jun 23, 2013:
I think something is missing in the sentence.
As it reads: "Place flame safeguard control run-check switch"
Place where?
Lydianette Soza (asker) Jun 23, 2013:
Mi interpretación del texto:

Coloque el interruptor de control del sistema de control de llama para comprobar su posicion y mantenerlo (estable?) por tiempo indefinido.
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search