Aug 12, 2018 10:10
6 yrs ago
4 viewers *
English term
rollout
Non-PRO
English to Arabic
Law/Patents
Law: Contract(s)
The Scope of Work is detailed as part of the next chapters. In order to assure a high level of quality for the project, the Bidder shall acknowledge the following requirements as general principles for delivery of Project Scope:
1.1.1 The Bidder shall provide all the needed materials required for the rollout of the passive network architecture equipment, part of the end to end GPON solution.
1.1.2 The Bidder shall provide all the required engineering services required for the rollout of the passive network architecture equipment required for delivery of the end to end GPON solution. The specifications of engineering services required for the passive equipment are provided in the chapters 2 - 19 of the Technical Requirements - Passive Infrastructure document.
1.1.1 The Bidder shall provide all the needed materials required for the rollout of the passive network architecture equipment, part of the end to end GPON solution.
1.1.2 The Bidder shall provide all the required engineering services required for the rollout of the passive network architecture equipment required for delivery of the end to end GPON solution. The specifications of engineering services required for the passive equipment are provided in the chapters 2 - 19 of the Technical Requirements - Passive Infrastructure document.
Proposed translations
(Arabic)
3 +1 | إطلاق - طرح | HATEM EL HADARY |
Proposed translations
+1
8 mins
Selected
إطلاق - طرح
إطلاق - طرح
منتج جديد /معدة في السوق
منتج جديد /معدة في السوق
4 KudoZ points awarded for this answer.
Something went wrong...