Salve, qualche idea su come tradurre 'computo metrico non estimativo'?
so che il computo metrico è 'bill of quantities', ma non sono certo su come rendere quel 'non estimativo'.
Grazie!
so che il computo metrico è 'bill of quantities', ma non sono certo su come rendere quel 'non estimativo'.
Grazie!
Proposed translations
(English)
4 +1 | Non-Specified Bill of Quantities |
Linda Thody
![]() |
4 | metric calculations [bill of quantities] are not estimated |
AzzTranslati (X)
![]() |
Proposed translations
+1
1 hr
Selected
Non-Specified Bill of Quantities
http://www.google.co.uk/#hl=en&sugexp=les;&gs_rn=1&gs_ri=hp&...
http://alihassanelashmawy.blogspot.co.uk/2011/12/bill-of-qua...
4- Non-Specified Bill of Quantities
As the name implies, this document contains only the items of work and their quantities as a stand alone document separated from the specifications documents of these works.
5- Specified Bill of Quantities
the specifications are incorporated with the bill of quantities in the form of preamble notes and the bill of quantities description. The quantities do not normally form part of the contract but preambles and descriptions are part of the contract.
It is Similar to the traditional BOQ but has the addition of a short type of specification included with each of the itemized materials and labor for each specific trade. Also at the beginning of the Specification Bill are clauses covering such things as:
notice to tenders
general conditions of contract
preambles etc.
http://alihassanelashmawy.blogspot.co.uk/2011/12/bill-of-qua...
4- Non-Specified Bill of Quantities
As the name implies, this document contains only the items of work and their quantities as a stand alone document separated from the specifications documents of these works.
5- Specified Bill of Quantities
the specifications are incorporated with the bill of quantities in the form of preamble notes and the bill of quantities description. The quantities do not normally form part of the contract but preambles and descriptions are part of the contract.
It is Similar to the traditional BOQ but has the addition of a short type of specification included with each of the itemized materials and labor for each specific trade. Also at the beginning of the Specification Bill are clauses covering such things as:
notice to tenders
general conditions of contract
preambles etc.
4 KudoZ points awarded for this answer.
52 mins
metric calculations [bill of quantities] are not estimated
I feel that ' not estimated' is indeed correct because from what I have understood, you are translating something that has to do with mathematics (in which apart from being a subject that involves direct calculations it also has a high percentage of approximations/estimates)