试车验收

English translation:

Perform (or run) acceptance tests

Added to glossary by ysun
Mar 16, 2004 15:36
21 yrs ago
Chinese term

试车验收

Chinese to English Tech/Engineering Manufacturing
完工后十五个工作日内试车验收 (未验收视为工程竣工)

Question:
试车验收 = acceptance test?? trial run??
Why 未验收 is taken as the completion of project???

Discussion

Last Hermit Mar 16, 2004:
Of this "����", there's no strict definition. Wan Gong=Jun Gong.
Non-ProZ.com Mar 16, 2004:
Yueyin Thanks!! :) Can you be so kind to clear my doubt about the part in brackets? I'm lost right now.
Non-ProZ.com Mar 16, 2004:
�Գ� Refers to "test run". I am working on a solar water heater so there's definitely no ��. *wink*
Non-ProZ.com Mar 16, 2004:
Last Hermit Exactly!! That's why I am confused by δ������Ϊ���̿���. If it has not been accepted, how can the project be closed?
Last Hermit Mar 16, 2004:
What kind of "che" is it?

Proposed translations

+2
6 mins
Chinese term (edited): �Գ�����
Selected

Test Run Acceptance

Test Run Acceptance

--------------------------------------------------
Note added at 18 mins (2004-03-16 15:55:23 GMT)
--------------------------------------------------

If no test run acceptance is carried out within the 15 working days, the project is deemed as completed.

(The contractor wants to finish everything ASAP and get all the $$$$$...)


--------------------------------------------------
Note added at 20 mins (2004-03-16 15:56:49 GMT)
--------------------------------------------------

\"...the project SHALL BE deemed as completed.\"

--------------------------------------------------
Note added at 24 mins (2004-03-16 16:01:23 GMT)
--------------------------------------------------

\"车\" means something that could be running.
开车 start up (operation)
停车 shut down

--------------------------------------------------
Note added at 3 hrs 12 mins (2004-03-16 18:48:58 GMT)
--------------------------------------------------

According to the context, 完工 here means completion of installation (building, equipment, utility and etc.), while 竣工 means completion of the project. If applicable, a warranty period may start from the date when an acceptance certificate is signed. For a small project like this, “test run acceptance” should be good enough.

Last Hermit raised a good point. The phrase “deemed completed” or “deemed to be completed” is certainly better.
Peer comment(s):

agree Last Hermit : With all due respect, "deemed completed" would sound better. For detail, please refer to http://www.bartleby.com/61/1/A0450100.html
23 mins
A good point. Thank you!
agree Zong Yang Yu
12 hrs
Thanks!
Something went wrong...
4 KudoZ points awarded for this answer. Comment: "Thanks for all your explanations. :)"
3 mins
Chinese term (edited): �Գ�����

工程竣工不代表合格。

要等验收合格后才行。
Something went wrong...
+1
25 mins
Chinese term (edited): �Գ�����

commissioning acceptance

commissioning acceptance or commissioning and acceptance

Commissioning Acceptance Phase
Commissioning Acceptance Phase. The functional performance ... before the. end of the acceptance
phase. The commissioning agent is responsible for interviewing the project manager and
operation and maintenance staff to determine their training needs. The ...
www.thespinnakergroupinc.com/ building%20commissioning__acceptance_phase.htm - 9k


Definitions of Commissioning on the Web:

is the phase during which the capabilities of the system are demonstrated in the final operational configuration under defined operating conditions. During commissioning, both verification and validation tests are performed on the complete system.
www.eumetsat.de/en/area4/msg/faq/72_faq_gloss.html


Start-up of a building that includes testing and adjusting HVAC, electrical, plumbing, and other systems to assure proper functioning and adherence to design criteria. Commissioning also includes the instruction of building representatives in the use of the building systems.
www.ebtron.com/indoor_air_quality/iaq_indoor_air_quality_gl...


An activity commenced at completion of construction and often including initial user occupancy, intended to allow designers and managers to check functional subsystems, to determine that the facility is functioning properly, and to undertake any necessary remedial action. Commissioning typically spans a period of 6 to 12 months.

www.ecostructure.com/res_glossary.htm


--------------------------------------------------
Note added at 29 mins (2004-03-16 16:06:29 GMT)
--------------------------------------------------

I agree with Last Hermit on his explanation of project completion and acceptance. These two terms seem to self-evident.

--------------------------------------------------
Note added at 30 mins (2004-03-16 16:07:03 GMT)
--------------------------------------------------

I agree with Last Hermit on his explanation of project completion and acceptance. These two terms seem to be self-evident.