Survey setting-out
English to Serbian
Tech/Engineering
Construction / Civil Engineering
kontekst:
1. Survey setting-out of civil structures within the area of latest approved Construction Plan, including recording in Site Logbook.
je li to neko postavlljanje instrumenata za geodetsko snimanje???
1. Survey setting-out of civil structures within the area of latest approved Construction Plan, including recording in Site Logbook.
je li to neko postavlljanje instrumenata za geodetsko snimanje???
Proposed translations
(Serbian)
3 | obeležavanje (obeležavanje geodetskog merenja) | Predrag M |
4 | Postavljanje radova | Ivana Bjelac |
Proposed translations
1 day 17 hrs
Selected
obeležavanje (obeležavanje geodetskog merenja)
Mislim da ovaj dokument može biti od pomoći.
--------------------------------------------------
Note added at 1 day17 hrs (2015-07-14 23:23:41 GMT)
--------------------------------------------------
Ili samo: geodetsko obeležavanje.
--------------------------------------------------
Note added at 1 day17 hrs (2015-07-14 23:23:41 GMT)
--------------------------------------------------
Ili samo: geodetsko obeležavanje.
4 KudoZ points awarded for this answer.
2 hrs
Postavljanje radova
"Član / Article 26 – Postavljanje radova / Setting-out"
Reference comments
1 hr
Reference:
setting-out > iskolčenje
ARTICLE 24 : Setting-out/ Iskolčenje
_________________
Član / Article 26 – Postavljanje radova / Setting-out
26.1. Izvođač radova je odgovoran za:
a) ispravno postavljanje radova u vezi sa originalnim oznakama, linijama i
referentnim nivoima koje mu je obezbedio Nadzorni organ;
b) tačnost pozicioniranja, niveliranja, dimenzioniranja i poravnanja svih delova
radova; i
c) obezbeđivanje svih neophodnih instrumenata, opreme i radnika u skladu sa
predviđenim odgovornostima.
The Contractor shall be responsible for:
(a) the accurate setting-out of the works in relation to original marks, lines and levels
of reference given by the Supervisor;
(b) the correctness, of the position, levels, dimensions and alignment of all parts of
the works; and
(c) the provision of all necessary instruments, appliances and labour in connection
with the foregoing responsibilities.
_________________
Član / Article 26 – Postavljanje radova / Setting-out
26.1. Izvođač radova je odgovoran za:
a) ispravno postavljanje radova u vezi sa originalnim oznakama, linijama i
referentnim nivoima koje mu je obezbedio Nadzorni organ;
b) tačnost pozicioniranja, niveliranja, dimenzioniranja i poravnanja svih delova
radova; i
c) obezbeđivanje svih neophodnih instrumenata, opreme i radnika u skladu sa
predviđenim odgovornostima.
The Contractor shall be responsible for:
(a) the accurate setting-out of the works in relation to original marks, lines and levels
of reference given by the Supervisor;
(b) the correctness, of the position, levels, dimensions and alignment of all parts of
the works; and
(c) the provision of all necessary instruments, appliances and labour in connection
with the foregoing responsibilities.
Peer comments on this reference comment:
disagree |
Ivana Bjelac
: "iskolčenje" je engl. "pegging", i samo je dio postupka.
32 mins
|
OK! Pozdravljam!
|
3 hrs
Reference:
Construction surveying
Construction surveying or building surveying (otherwise known as "lay-out" or "setting-out") is to stake out reference points and markers that will guide the construction of new structures such as roads or buildings. These markers are usually staked out according to a suitable coordinate system selected for the project.
https://en.wikipedia.org/wiki/Construction_surveying
https://en.wikipedia.org/wiki/Construction_surveying
Note from asker:
meaning:SITUACIJA građevinskih objekata??? |
Discussion
Ovaj dokument bi Vam mogao olakšati razumijevanje cjelokupne tematike:
"Surveying and Setting Out"
http://www.ilo.org/public/english/employment/recon/eiip/down...